Posts Tagged ‘bayliner restoration’
1983 Bayliner Contessa Boat Restoration Video Part 3
Here at baylinercovers.com we are going to take you through a step by step process of restoring a 1983 Bayliner Contessa, 29ft Cabin Cruiser. Here is part three……
1983 Bayliner Contessa Boat Restoration Video Part 3
This episode is the third of a series about the recostruction and restoration of a 29 foot Bayliner Cabin Cruiser.
It covers from the making and installation of the custom fish box to the redesign and reconstruction of the engine compartment, using fiberglass reinforced honeycomb panels in setd of plywood.
The restoration of this 1983 Contessa will include the redesign of the hull interior, new floors supports, walls and furnishing, with the goal of reducing weight, increasing performance, reliability and reducing operating cost along with the reduction of hydrocarbon emissions thanks to these innovations and use of eco friendy components.
Each Episode will cover different aspects of the rebuilding process, which is expected to be completed by the end of 2010.
1983 Bayliner Contessa Boat Restoration Video Part 1
Here at baylinercovers.com we are going to take you through a step by step process of restoring a 1983 Bayliner Contessa, 29ft Cabin Cruiser. Here is part one……
1983 Bayliner Contessa Boat Restoration Video Part 1
This episode is the first of a series about the reconstruction and restoration of a 29 foot Bayliner Cabin Cruiser. It covers from the instant we got the boat through the completion of the hull interior surfaces. Many areas were damaged by fresh water causing dry rot and requiring removal, repair and rebuild of hull and internal structural areas.
The restoration of this 1983 Contessa will include the redesign of the hull interior, new floors supports, walls and furnishing, with the goal of;
Rreducing weight, increasing performance, reliability and reducing operating cost along with the reduction of hydrocarbon emissions thanks to these innovations and use of eco friendy components.
Each Episode will cover different aspects of the rebuilding process, which is expected to be completed by the end of 2010.
